    基于时序InSAR的白音华露天矿地表形变监测

    Surface deformation monitoring of the Baiyinhua open-pit mine based on time-series InSAR

    • 摘要: 利用国家电投集团内蒙古白音华煤电有限公司露天矿(以下简称“白音华露天矿”)2022年1月-2024年11月期间的36景Sentinel-1影像数据,采用短基线集干涉测量技术(SBAS-InSAR)获取了地表形变速率与时间序列累计形变量。基于内符合精度验证了监测结果的可靠性,并分析了形变的时空演化特征。研究结果表明,白音华露天矿地表形变以沉陷为主,形变总面积约85.06 km2,其中沉陷面积约76.18 km2,占比约89.55%;抬升面积约8.88 km2,占比约10.45%。地表抬升主要分布于一、二号露天矿采场西部区域,其余区域均以沉陷为主。三号露天矿采场沉陷最为严重,最大沉陷速率为116 mm/a,最大累计沉陷量为334 mm。基于10个特征点的形变趋势分析表明,局部地区形变将持续加剧,形变范围可能进一步扩大,需较长时间方可趋于相对稳定。

       

      Abstract: Using 36 Sentinel-1 images acquired over the Baiyinhua open-pit mine in Inner Mongolia, China, from January 2022 to November 2024, surface deformation rates and time-series cumulative deformation were derived by means of the Small Baseline Subset Interferometric Synthetic Aperture Radar (SBAS-InSAR) technique. The reliability of the monitoring results was validated based on internal accuracy, and the spatiotemporal evolution of deformation was analyzed. The results show that surface deformation in the Baiyinhua open-pit mine is dominated by subsidence. The total deformation area is approximately 85.06 km2, of which the subsidence area is about 76.18 km2 and the uplift area is about 8.88 km2, accounting for 89.55% and 10.45%, respectively. Uplift is mainly concentrated in the western parts of the No. 1 and No. 2 open-pit mining areas, while the remaining areas are largely characterized by subsidence. The most severe subsidence is observed in the No. 3 open-pit mining area, with a maximum subsidence rate of 116 mm/a and a maximum cumulative subsidence of 334 mm. An analysis of deformation trends at ten feature points reveals that localized deformation will continue to worsen and likely spread further, and the affected area will take a long time to approach relative stability.

       

    /

    返回文章
    返回